H Bell And Sons (R) Ltd

Building Contractors

Complete refurbishment of the Bird In The Hand at Birtle to The Bird at Birtle on behalf
of Andrew Nutter from Nutters Restaurant.









 Work Undertaken
Removal of existing walls and formation of new ones - including plastering and decoration.
New toilets, sinks and cubicles supplied and fitted.
Formation of reception desk and installation.
New suspended ceiling and lighting.
Electrical socket and data point relocation.
Floorings to main reception area and toilets.
All work undertaken out of hours under strict working conditions.


Work Undertaken
H Bell and Sons provided the required trained staff to operate a cherry picker to enable
a company refurbishing the stain glass windows at Rochdale Town Hall to gain access
to remove and replace them once refurbishment had taken place.

Work Undertaken
Ground works and preparation for the delivery of the cabin.
Supervision on delivery and positioning of the cabin by crane.
Installation of electrical and water supplies to prefabricated building.
Access ramp and steps installed with hand rails to current regulations.
Erection of steel constructed walk way and corrugated plastic cover

Marland School at Rochdale has had a complete refit to provide one main large area for children to play in.

Work Undertaken
Repositioning of electric and computer sockets
Installation of lighting
Complete redecoration
Installation of new grid to ceiling and tiles
Total replacement of flooring

 
The refurbishment of a soft play area at a local school and the installation of drainage which had initially not been installed by the contractor who had done the work.  

    
The pictures below show the changing of patio doors to tailor made bi folding doors on a domestic premise.  The installation of the bi fold doors increased the light into the orangery and also enabled the client to open the room up to the outside. 
H Bell have been contracted to install a new fire escape at a local school in Rochdale. On the 10/08/2015 the first of two lifts was made to place the 3 ton, lower level of the concrete stairs in place. When the second lift Is completed then the remainder of the external brickwork can be completed and the roof installed.

     
H Bells were called out to find a leaking water pipe without knowledge of where it was, repair it and reinstated
the area back as originally found.
         
H Bell and Sons have completed a new extension at
Hazelhurst School in
Ramsbottom to create a new classroom.


Copyright © 2016 H Bell & Sons (R) LTD - Registered in England & Wales - 01557160